MDPE Mains Water Installation: Ellesmere Port

MDPE INSTALLATION CASE STUDY

Vauxhall, Ellesmere Port

The problem: Vauxhall required a new boiler house at their Ellesmere Port site. 

The project required a mains water supply to service the boilers. To do this, a new branch on the existing 6” water main was required. 

Our solution:  As leading hot tapping specialists, Ormond Pipework Services were brought in to establish a live connection to the existing water supply. 

We attached a hot taping clamp to the water main and then drilled the new 50mm branch. 

After hot tapping the mains water, our pipework engineers installed 10m of underground MDPE and left off with a 50mm stop cock.

Once the MDPE installation was complete, a pressure test was completed to ensure the quality and safety of the new pipework.   

Tasks involved:

We have used Ormond's hot tapping services for over 20 years, and will continue to do so

Richard Milner
South Yorkshire Mechanical, on behalf of Barnsley Hospital

Ormond Pipework made my job easy and I would highly recommend them

Anna Page
Great Bear Distributions

Ormond have done our hot tapping for the last 10 years, we trust them to always get the job done.

Jamie Griffin
Webber N.W Ltd Chief Engineer, on behalf of Jaguar Land Rover

Very professional. We choose Ormond every time for our pipework.

Pete Woodall
Smart Tec Solutions, on behalf of M&S

Our recent commercial gas engineering projects

View all projects →